Dedicated workflows for National Highways and Network Rail environments, automatic ecological constraints, contractor-ready job packs and ESG-aligned reporting outputs.
Survey, plan and book road space directly from the field — with mapping outputs the National Highways supply chain already recognises.
From OLE clearance checks to possession planning, the rail workflow captures what's needed for safe, compliant works in the rail corridor.
Integrated ecological workflows reduce the risk of legal breaches during vegetation operations — every constraint applied, every alert raised, every exclusion mapped.
Seasonal works restrictions, licence requirements and habitat protection automatically applied.
Roost potential triggers PRA and EPS licence flags before any felling is signed off.
Nesting season constraints with regional calendars and stop-work triggers.
Watercourse buffers and exclusion zones generated automatically from GIS data.
Sett mapping with statutory stand-off distances and seasonal disturbance windows.
District Level Licensing support, pond-buffer GIS layers and mitigation routing.
Every UA1, UA2 and UA5 ticket recorded with expiry date and authorised voltage — so the dispatcher never sends the wrong person to a 33 kV span.
UA1, UA2.1–2.3, UA5.1, UA5.2 tickets per operative with renewal dates and CPD records.
30-day and 60-day warnings on every ticket. Expired operatives blocked from PTW issue.
Per-operative authorised voltage (11 kV / 33 kV / None) — enforced before deployment.
PTW status visible across the team — who's working where, on what voltage, with what permit, expiring when. Tied directly to the tree records and competency register.
Highway-verge works tracked end-to-end — from permit application through Chapter 8 traffic management to closure.
Major and minor Street Manager permits with road, duration, status and expiry. Pending applications surfaced for chase.
Each permit flagged for Chapter 8 requirement — generated, required or not applicable — driven by road class and speed limit.
Permit numbers, status changes and notice periods pulled directly from the national streetworks system.
Enter the road, speed limit and lane count — the generator produces the layout, signing, coning, lighting and SWQR requirements. Attach the resulting plan to the permit.
Significantly reduce administrative overhead while improving consistency and reporting quality across every contract.
Supports ESG objectives and public-sector reporting requirements with environmental data captured at source.
Per-job and per-programme carbon estimates linked to plant choice and access route.
Habitat condition recording aligned to BNG metric inputs and DEFRA categorisation.
Quantify retained habitat values and ecological benefits across vegetation programmes.
i-Tree Eco and Canopy data captured in the field rolls up into ecosystem service reports.
Live ESG dashboards for client, framework and asset owner reporting.
Reporting formats suitable for utility frameworks, National Highways and Network Rail.
The MyArborPro Survey App combines utility arboriculture, ecology, GIS mapping, mechanisation planning, compliance management and operational intelligence into a single intelligent platform.
Fewer mobilisations, better deployments, less rework.
Right machine, right team, right time — backed by data.
Consistent outputs across every contractor on the framework.
Constraints and licences applied automatically, with audit trail.
Forecasts, suitability scoring and benchmarked productivity.
Find nearby plant before sending another low-loader.
Pooled intelligence across utilities, highways and rail.
Evidence-based pricing models from live benchmark data.
Early warning on ecology, terrain and programme overrun.
Vegetation clearance with a full digital audit trail.
The long-term vision is to evolve the platform from a survey tool into a predictive operational intelligence and collaborative resource-sharing system for vegetation and environmental infrastructure management across the UK.